top of page

Our Projects

Self-Storage Facility
Pennsylvania

• Zoning Variances
• Grading Plan
• NPDES Permit

A confidential client retained KEY to prepare a Land Development Plan Application for a self-storage facility on an approximate 4-acre parcel in Allegheny County, Pennsylvania. The property is located in the M-2 (Manufacturing) zoning district. The project will be developed in two (2) phases. The initial phase will have five (5) single-story buildings with a combined 20,000 sf of storage space. These buildings will be slab on grade structures constructed primarily of steel. The second phase will consist of a three-story, 30,000 sf climate controlled building. This structure will also be a slab on grade and constructed of steel, concrete, glass and brick veneer. A subsurface detention system was designed to control post-development stormwater flows to pre-development conditions.

KEY Logo

Headquarters

200 Third Avenue

Carnegie, Pennsylvania 15106

412-279-3363

© 2024  Key Environmental, Inc.

Mid-Atlantic

575 State Route 28

Suite 203

Raritan, New Jersey 08869

908-864-4105

New England

106 Lafayette Street

Suite 2K

Yarmouth, Maine 04096

207-772-8100

Tri-State

1723 Perry Highway 

Portersville, Pennsylvania 16051

724-368-4050

bottom of page